It was proposed that an existing building be EQ strengthened for alterations and an internal fitout.  The building had an existing Type 3 alarm with heat detection and manual call points, so this was modified to suit the proposed layout.  A hinged gate from the courtyard was required to comply with C/AS5 means of escape.