A fire engineering design was carried out for the NZ Fruit’s packhouse extension.  A C/VM2 fire safety assessment was provided to satisfy the Building Act requirements to comply with the Building Code clauses C1-C6, for the addition of a 40 x 40 m new packhouse to the existing packhouse and cool-store building.